San Vicente Gas Terminal

LPG unloading jetty
Detail design engineering
Abastible S.A. appointed Belfi S.A. an EPC type contract for a new marine terminal for unloading gas and liquid products in San Vicente Bay, in Biobío region of Chile. The execution of the detail design engineering was appointed to PRDW.
Chile, Biobío, Bay of San Vicente
2003

PRDW participated in the definition of a preliminary structural project for the EPC bid. After the appointment, the detail design engineering and complementary studies were executed.

The marine works project included the design of a 2.2km access trestle, the unloading platform, 4 breasting dolphins, 4 mooring dolphins and gangways. Besides the structural design of all the marine works.

PRDW executed the following studies and activities:

  • Numerical modeling of the ship at berth dynamics.
  • Reformulation of the berth area.
  • Reformulation of the levels of the structure.
  • Hydrodynamic loads along the access trestle and berth area.
  • Supervision and coordination of the soil mechanics studies, maneuvering and navigation aids and field measurements.


Notice: ob_end_flush(): failed to delete and flush buffer. No buffer to delete or flush in /home/prdwcom/public_html/wp-content/themes/prdw/functions.php(8) : runtime-created function on line 1