BELFI appointed PRDW, in an EPC type project with Cobra Central Termica Mejillones S A, to conduct a basic and detail design of a sea water intake and outfall system for the Angamos Thermoelectric Plant in Mejillones Bay, Antofogasta, Chile.
The project required the design of a 5,200 m3/h sea water intake located at a depth of-8.0m NRS through a pipeline approx. 0.9m in diameter, and the design of the 3 500m3/h water outfall approx. 0.93m in diameter. Their respective diffusers are located at -8m NRS.
The project also required the structural design of the pipe support jetty and the intake towers.
Further engineering input from PRDW included the following analyses and studies: