TGN: Mejillones bulk terminal
Unloading terminal (mainly coal) for attention ships Panamax of 80,000 DWT, and with a capacity of 6MTPA. The terminal consists of a jetty and a mechanized system.
TGN: Mejillones bulk terminal Leer más ”
Unloading terminal (mainly coal) for attention ships Panamax of 80,000 DWT, and with a capacity of 6MTPA. The terminal consists of a jetty and a mechanized system.
TGN: Mejillones bulk terminal Leer más ”
EPC contract for the design and construction of a new jetty for LNG vessels up to 265 000m³.
LNG Quintero: Unloading jetty Leer más ”
Maritime civil works for two berths for LNG ships, one for a permanent FSRU in its first phase and the other for unloading LNG.
LNG Mejillones: Unloading jetty Leer más ”
Wharf for handling cargo, complete with breakwater protection, passenger landing facilities, and slipway for rescue craft.
St Helena Island: Rupert’s Bay permanent wharf Leer más ”
Site data collection, feasibility studies, licensing reports, in addition to the detailed design of the breakwaters, pump house structures and the cooling water outfall.
Koeberg Nuclear Power Station: Cooling water intake basin Leer más ”
New entrance channel which allows for the safe access of all vessels up to an equivalent size of a 9,200 TEU container ship under most weather conditions.
Port of Durban: Harbour entrance widening and deepening Leer más ”
Coastal engineering for the development of Eden Island in the Seychelles.
Seychelles: Eden Island marina development Leer más ”
Core marine engineering consultants to the professional team, in which capacity they have been involved with various projects in the waterfront.
Victoria and Alfred Waterfront: Marine works infrastructure Leer más ”
Dredging specialist expertise during the execution of capital dredging works for two new container berths.
Port of Ngqura: Dredging and excavation of temporary bund Leer más ”
Detailed engineering of the Cooling Water Intake and Cooling Water Outfall systems for the new thermal power generation Units (6 & 7) as part of the expansion of Mejillones Power Plant. Each unit is designed to generate a gross electrical output of 375MW.
PIEM Red Dragon: Sea water intake and outfall for cooling system Leer más ”